Fraud Alert: If you received an unexpected job offer from RS&H, please notify us.

Projects

Projects at Colorado Springs Airport included runway rehabilitations, apron rehabilitation, taxiway reconstructions, landside improvements, planning studies, and owner representation.

Aviation

RS&H partnered with FDOT on the A1A project which included replacing five bridges in Jacksonville Beach and Neptune Beach in addition to widening/improving the outfall channel serving these communities.

Transportation

These rest areas involve new construction of buildings, outbuildings, picnic pavilions, and concrete pavement to provide increased vehicular and heavy truck parking capacities.

Transportation

The airport tasked the RS&H-led design team to develop a plan that provided flexibility for simultaneous deicing of five Group V (Airbus A350) or ten Group III (Boeing 737) aircraft, maximizing the airport’s operational capacity during winter months.

Aviation

RS&H is providing design services for the I-70 West Vail Pass Auxiliary Lanes project, which is being completed through the construction manager/general contractor (CM/GC) delivery method.

Transportation

RS&H provided design services for the Florida Turnpike Enterprise’s (FTE) All-Electronic Toll (AET) Phase 8 Ticket System, converting 148 miles of the Turnpike mainline to cashless toll collection.

Transportation

The Houston Airport System (HAS) operates three airports: George Bush Intercontinental Airport/Houston (IAH), William P. Hobby Airport (HOU), and Ellington Airport (EFD).

Aviation

The new six-lane divided highway and bridge now serves as a critical hurricane evacuation route, a multi-modal transportation alternative including automobile, bicycle, pedestrian, and public transit accommodations, and includes an ADA-accessible canoe launch area.

Transportation
Aerial view of Crosstown Parkway park.