Employee ownership is accessible to everyone at RS&H. Learn how we collectively succeed together.

Command Complex & Triangle Area Development Plans

Project Details

Solutions

Location

Colorado Springs, CO

Client / Owner

Peterson Air Force Base

Awards

Honor Award, Outstanding Area/Site Development Plan - Federal Planning Division of APA

RS&H was hired by Peterson AFB to produce two Area Development Plans (ADP) focusing on the Command Complex and Triangle Areas, aiming to show how a walkable, livable community could connect new administrative and office uses with an attractive, connected, and useful “town center” that focused on pedestrian and user connections within the area.

After extensive interviews with area users and experts, the project team used a planning charrette process to develop and evaluate alternative development scenarios for the areas. By utilizing 3D-printed scale models of existing facilities set on detailed GIS constraints mapping, charrette participants were able to develop alternatives and test ideas quickly and with a high level of confidence. Once the alternatives were established, the charrette teams worked to evaluate alternatives on both aesthetics and practicality, ensuring that the preferred alternative was both exciting and possible and that the final plan retained optionality and was resilient to future changes in priorities.

The final plan included connections to surrounding uses, a new pedestrian-oriented main street with street parking, narrow right-of-way, and appropriately scaled and flexible mixed-use development that aligned with surrounding users and utilized existing facilities. The plans were documented with clear and visually striking graphics that enable the project proponents to visualize the future state, advocate for implementation along the way, and get their leadership excited about the possibilities. The resulting plans are popular and useful at Peterson AFB and will be a great tool as the area is transformed over the coming years.

“[The project team] was exceptional. They met or exceeded all their requirements, many times going way beyond what they were obligated to do.” – Contracting Officer

Explore Exciting Career Opportunities with Us!

Related Projects

RS&H was tasked with compiling data for a space utilization report at Peterson AFB, CO. The purpose of the project was to survey 91 buildings totaling 2,033,400 GSF and provide an assessment of existing conditions to establish accurate inventory data.

Federal

The building of the North Colorado Springs Readiness Center (NCSRC) represents the culmination of a successful collaboration between the United States Air Force Academy (USAFA) and the Colorado Army National Guard (COARNG) to locate a National Guard facility on USAFA property.

Federal

RS&H’s Master Planning and GIS Mapping role in the Installation Development Plan process was to produce the IDP document and populate sections concerning installation capacity analysis, sustainable development indicators, future development planning, plan implementation, and GIS mapping for multiple bases.

Federal