Employee ownership is accessible to everyone at RS&H. Learn how we collectively succeed together.

North Colorado Springs Readiness Center

Project Details

Solutions

Location

Colorado Springs, CO

Client / Owner

United States Air Force

Focus Areas & Services

Awards

LEED® Platinum AIA Design Citation Award - Colorado South Chapter

The building of the North Colorado Springs Readiness Center (NCSRC) represents the culmination of a successful collaboration between the United States Air Force Academy (USAFA) and the Colorado Army National Guard (COARNG) to locate a National Guard facility on USAFA property. It supports one Infantry Headquarters company and one Infantry company with a combined manning strength of 344. Although the facility is located on USAFA property, it is outside the USAFA fence line, separated from the USAFA proper by Interstate 25. The singular nature of the site required HB&A to coordinate closely with multiple stakeholders. Sustainable design was a primary focus in developing the design of the NCSRC, ultimately resulting in certification of the project by USGCB as LEED® Platinum.

“Characterizing RS&H’s effort on this project as exceptional is well deserved. They overcame numerous challenges including a very high level of scrutiny during design to satisfy our host, the facility is on the US Air Force Academy. Additionally, RS&H stepped up during construction when an error/omission by one of their consultants disrupted construction. The facility has received a LEED® Platinum certification!” – Bob Datson, Chief of Design & Project Management, Colorado Army National Guard

Explore Exciting Career Opportunities with Us!

Related Projects

RS&H was hired by Peterson AFB to produce two Area Development Plans focusing on the Command Complex and Triangle Areas.

Federal

RS&H was tasked with compiling data for a space utilization report at Peterson AFB, CO. The purpose of the project was to survey 91 buildings totaling 2,033,400 GSF and provide an assessment of existing conditions to establish accurate inventory data.

Federal

RS&H’s Master Planning and GIS Mapping role in the Installation Development Plan process was to produce the IDP document and populate sections concerning installation capacity analysis, sustainable development indicators, future development planning, plan implementation, and GIS mapping for multiple bases.

Federal