Fraud Alert: If you received an unexpected job offer from RS&H, please notify us.

A New Era in Spaceport Launch Cadence & the Reusability Problem It Poses

March 28, 2022      By Josh Saltsman, PE

Tags: Aerospace

The current climate of the aerospace industry is ripe with ideas and opportunities to extend humanity’s presence far beyond our earthly origins. With destinations such as the Moon and Mars at the forefront of the minds of dreamers and engineers alike, a “Giant Leap” akin to Apollo-era accomplishments seems inevitable.

Outdated Spaceport Logistics Threaten a Bottleneck

Private companies are competing against each other, causing the development of new spacecrafts and ground support equipment to skyrocket. As the extraterrestrial aspirations of nations, companies, and individuals converge to define our collective vision of the future, an outdated spaceport logistics schema threatens to bottleneck the ever-increasing demand to send payloads to space.

These outdated aspects include limited capable vehicles to meet demand, limited manufacturing and processing capabilities, and inadequate launch infrastructure. As the industry expands, issues with the current spaceport launch cadence capabilities will only become more prevalent. To accommodate this rapidly increasing demand, launchpad upgrades and expansion of existing vehicle manufacturing and processing facilities will be crucial.

Prepare Now for Future Space Travel

One thing is certain – as humans continue to push towards becoming a space-faring species, the current spaceport logistics schema needs an upgrade to support the increased demands of future endeavors.

Recently, several RS&H aerospace professionals created a white paper that dives into what will undoubtedly be some of the first areas to address when beginning to prepare for the future for launch logistics:

  • Growing demand for launches
  • Limited manufacturing and processing capabilities
  • Launch infrastructure limitations
  • The need for a new universal metric

While not a comprehensive evaluation of the problems facing launch logistics and how to solve them, this paper serves as a solid jumping off point for future conversations.

If you would like to read it and join the conversation, please tell us in the form below where to send your copy.

Learn more about the spaceports RS&H has helped plan and license.

Photo Credit: (NASA/Bill Ingalls)

Stay in the Know

Sign up to receive RS&H and industry news, blogs, case studies, and more in our monthly newsletter.

Name
Accept GDPR Terms(Required)
This field is for validation purposes and should be left unchanged.

Related Insights

insight
What’s All This Buzz About Sustainability?
October 25, 2024By Linnea Brudenell, AIA, LEED AP BD+C

No longer on the bench as a ‘nice to have,' resilience and sustainability are top of mind as businesses move beyond ‘greenwashing’ and ‘eco-friendly’ to a new era where architects and engineers use design strategy and advanced technology to usher in next-generation sustainability.

AviationAerospaceCorporateFederalHealthcareScienceTransportation

RS&H Vice President and National Project Control Leader, Bob Jones gives an in-depth look into project controls and how it keeps projects in budget and on time.

AviationAerospaceTransportation
insight
Celebrating Earth Day: A Discussion with RS&H’s Resiliency & Sustainability Leaders
April 22, 2024By Linnea Brudenell, AIA, LEED AP BD+C, Alex Howard

Every Earth Day serves as a reminder to celebrate to celebrate the achievements of the environmental movement and raise awareness about environmental consciousness.

AerospaceCorporateAviationFederalScienceHealthcareTransportation
insight
Mental Health in the AEC – Sympathy vs Empathy
July 18, 2023By Holly Tishfield

It starts with understanding the difference between sympathy and empathy and recognizing how these concepts can foster meaningful connections.

TransportationAviationAerospace