[WEBINAR] Join subject matter experts to discover how technology is enhancing transportation and tolling industries. Register today! 

IL 31 over US 20

Project Details

Solutions

Size

Overall: 180 feet (two span)

Square footage (deck area): 18,360

Total project length: 1.2 miles

Location

City of Elgin, IL

Delivery Method

Design-Bid-Build

Client / Owner

Illinois Department of Transportation, Region One/District One

This project is a critical link for the Elgin community, connecting neighborhoods to the downtown business district, while providing access along US 20.

As part of IDOT’s long-term US 20 improvement plans, this project in Kane County, IL enhances safety and mobility for all modes of transportation while increasing the service life of US 20. The existing structure was built in 1959 and consists of a simple span steel wide-flange beam bridge with 71’-10 1/8” back-to-back abutments, out-to-out deck width of 70’-0 5/8”, and closed abutments on spread footings.

RS&H is providing construction engineering and inspection services for the replacement of the steel beam bridge carrying IL 31 over US 20 and reconstruction of the interchange ramp sections. Maintenance of traffic includes detouring for staged demolition for bridge replacement and US 20 entrance and exit ramps. A 10-foot shared-use path and seven-foot sidewalk will be constructed, and traffic signals and lighting will be replaced throughout the project. This project will also include replacement of the City of Elgin’s watermain, sanitary sewer, and fiber optic conduit. RS&H is also providing drone aerial progress imaging for this project.

RS&H logo in blue.
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.